Architects Collective

South Nursing Ward Building, University Hospital Vienna

Project description

New construction of a bed replacement unit

Location

Vienna, AUT

Client

University Hospital Vienna (AKH Wien)

Planning phases

Basics / pre-design / design / detail planning / submission and implementation planning

Planning

2021 – 2023

Completion

2023 – 2024

Usable floor area                

3.300 m²

Gross floor area

5.900 m²

Architecture planning

Architects Collective ZT GmbH & HWP Planungsgesellschaft mbH

Visualization

Telegram71

Between now and 2030, approximately €1.4 billion will be invested in the construction, renovation and modernization of buildings at the joint sites of the University Hospital Vienna (AKH Wien), and the Medical University of Vienna. This will create a new, highly efficient and modern infrastructure for patients, staff and visitors, as well as for research and education, to ensure the best possible medical care and to prepare for future challenges. Subsequently, the Bettenhaus Ost (eastern ward), which is visible from afar, will also be renovated. In order to maintain hospital operations during the renovation, a bed replacement unit, the nursing ward building south, will be constructed.

High-quality replacement quarters for the highest demands
The replacement quarters are located in the south garden of the AKH campus and meet the highest standards for all structural and structural-physical requirements for permanently approved buildings. The new building, which is connected to the main building and is constructed primarily of modular wood, consists of four floors that largely accommodate wards and a day clinic for the care of cancer patients.

Inclusive circular economy
Access to the new nursing ward building south is to the west, where a high-level control centre is connected to the main building of the University Hospital Vienna to ensure internal patient transfer. The day clinic is located on the first floor, followed by a support unit on each floor. The new building´s wooden module construction and wooden façade make an important contribution to the circular economy and, together with the photovoltaic system on the roof, support the sustainability goals of the City of Vienna and a reduced carbon footprint.


The 112 prefabricated wooden modules each comprise a 32 square metre turnkey patient room, Image: University Hospital Vienna (September 2024)


The wooden modules for the temporary accommodation during the renovation of the bed towers at University Hospital Vienna, the new south ward building, were recently delivered, lifted into place and bolted together. The delivery and lifting of the turnkey timber modules will be finalised in October 2024 and the new south ward building will be completed in 2024.


We from Architects Collective joined the convoy of module deliveries and travelled in front of, behind and between the timber modules and accompanying vehicles in the dark. Here we share some impressions of the special transport just outside Vienna to the construction site of the modern timber hybrid building at University Hospital Vienna.


Time lapse of timber module construction in production in Styria, video courtesy of Lieb Bau Weiz


The 112 modules, prefabricated entirely from wood, each comprise a turnkey patient room. The modules are transported from Styria via an approved route at night to Vienna, where they are lifted into place and bolted together with millimetre precision. The south ward building is therefore particularly innovative and makes an important contribution to the circular economy and the City of Vienna's sustainability goals.



 

 

The replacement quarters meet the highest standards for all structural and structural-physical requirements for permanently approved buildings.

Ground floor


Standard floor


The new building´s wooden module construction and wooden façade make an important contribution to the circular economy


Elevation south


Site plan with context University Hospital Vienna area


Datenschutz & Cookies

Wir ersuchen um Ihre Zustimmung für Cookies. Marketing-Cookies werden erst mit Ihrer Zustimmung verwendet, unsere Website ist werbefrei. Mehr erfahren

akzeptieren

ablehnen